Field Report Nº 02 · Steel Manufacturing, AlabamaClass II modeling for a major steel expansion

AERMOD modeling for a major Alabama steel expansion: compliance shown for every pollutant and a PSD permit approved with no modeling-related conditions.

The situation

A major steel manufacturing facility in Alabama was undergoing a significant capacity expansion.

What SOLA did

SOLA modeled emissions from multiple new and modified sources using EPA's AERMOD system, incorporating site-specific meteorological data, complex terrain features, and nearby source interactions, then evaluated impacts against all applicable NAAQS and PSD increments.

The result

  • Compliance demonstrated across all pollutants and averaging periods
  • PSD permit approved with no modeling-related conditions or delays
  • Approval secured before EPA lowered the annual PM2.5 standard, with little time to spare

Facing something similar?

Tell us where your project stands. A principal, not a sales rep, responds within one business day.

Prefer to talk now? (844) 211-5575

Call (844) 211-5575 Start a project